Spa Lining and Refurbishment

Poly Advisory Can Cover all of Your Spa Lining and Refurbishment Requirements

Overview

Most commercial Spa’s are installed when the building is constructed so are not easily replaced as walls or rooms may have been constructed after the spa was installed. Generally Spa’s are manufactured from GRP which can suffer from Osmosis causing either the tiled or acrylic finish to fail.

As a cost effective alternative to replacing the Spa Poly Advisory can install our PASLAM epoxy lining membrane to give the Spa a complete new look and extend the lifespan indefinitely. The entry steps are coated with an anti-slip finish and coloured demarcation.

Have any questions?

please call

Facebook
Twitter
LinkedIn

CASE STUDIES

Sandwell Aquatics Centre

Sandwell Aquatics centre drainage channel case study

more projects